Manufacturing and delivery of the waste heat recovery boiler to be installed in the Bromine Recovery Facility of Bromine Compound Ltd. has been completed. Delivered WHRB is a water tube, drum type, natural circulation boiler and will utilize the latent heat of process flue gas containing high constituents of bromine and sulfur for the production of 7 t/h saturated steam at 25 barg. The boiler has been 100% manufactured by BGM under ERK license. The project has been succesfully completed on time.
|