Client / Project Project Scope Year
IC-Limak Rehabilitation on EPC Turnkey basis of 1050 MW thermal power plant. -
Azerenergy Erection Supervision, Commissioning, and Start-up of Janub 750 MW Combined Cycle Power Plant (group ref. with GKE Energy) 2014
EUAS Modernization of Ambarlı 810 MWe Combined Cycle Power Plant including Steam Turbine, Generator Control, and new I&C systems; Mechanical rehabilitation and DCS implementation. 2012
ATAER ENERGY Supply & Erection of Heat Recovery Steam Boiler (OTSG), air-cooled condenser; complete plant engineering and control system extension for Izmir 60 MWe Combined Cycle Power Plant. 2010
ENTEK ENERGY Turn-key construction of GE LM 6000 Gas Turbine, Heat Recovery Steam Boiler (OTSG) and electrical/mechanical Balance of Plant including civil works for Izmit 60 MWe Combined Cycle Co-generation Plant Extension. 2009
CERKEZKOY & NAR ENERGY Turn-key construction of GE LM 6000 Gas Turbine, Heat Recovery Steam Boiler (OTSG), electrical/mechanical Balance of Plant including 5 km underground steam piping at Cerkezkoy 48 MWe Co-generation Power Plant. 2009
SISECAM GROUP SODA INDUSTRY Replacement of 11X fuel oil burners with Natural Gas burners in 3X boilers (460T/H total) at Mersin Soda Factory. 2009
DOGA ENERGY Supply and installation of natural gas heating system for 3X GE Frame 6 Gas Turbines. 2008
CTU CONSORTIUM, Switzerland Design and manufacturing of heat recovery steam boiler (6T/H) for Bromine Recovery Unit Plant. 2008
SKODA POWER, Czech Civil works for Erdemir 40 MWe Steam Turbine Generator Extension, including steam turbine foundation, power house, control building, and HDPE sea water cooling lines. 2007
EKON, Turkey Engineering, manufacturing, installation, and commissioning of Askale Fuel Oil Treatment Plant. 2007
OYAK EKON PROKON, Turkey Engineering, procurement, erection, and commissioning of 2X Steam Boilers (75T/H each) and 2X Siemens Steam Turbines (8.2 MWe each) for Kayseri Bogazliyan Sugar Factory. 2007
MASTIR ENERGY, Turkey Engineering, supply, installation, and commissioning of Deaerator (53m3) for steam boiler (135T/H) at Eren Corlu Power Plant. 2007
ENERJISA, Turkey Design, manufacturing, supply & installation of heating coils for auxiliary boilers at Kentsa Power Plant. 2006
Client / Project Project Scope Year
PALMET ENERGY Simple & Combined Cycle Power Plant Engineering, Project Management for 60 MWe Combined Cycle Power Plant. 2012
EKON PROKON Basic Detailed Engineering of 2X Siemens SGT 5-4000F GT, 2X HRSG, Rehabilitation of 2X 150 MWe existing Steam Turbines for Ambarli Repowering. 2012
ZORLU ENERGY Basic and Detailed Engineering of GE LM 6000 GT, HRSG, Steam Turbine, ACC and Auxiliary Equipment for Luleburgaz 65 MWe CCPP Extension. 2011
AKSA ENERGY Basic & Detailed Engineering of 4X GE LM 6000 GT, 4X HRSG (OTSG), 2X GE ST, 2X Siemens SGT 5-4000F GT, 250 MWe Steam Turbine, Cooling Systems & Auxiliary Equipment for Antalya 1000 MWe Power Plant. 2011
UGUR ENERGY Simple & Combined Cycle Power Plant Engineering, System Siemens PCS7 Plant Control System Supply for Cerkezkoy 65 MWe Combined Cycle PP. 2010
ATAER ENERGY Basic and Detailed Engineering of GE LM 6000 GT, HRSG (OTSG), Steam Turbine, ACC & Auxiliary Equipment for Izmir 60 MWe CCPP Extension. 2010
ENTEK ENERGY Complete Combined Cycle Power Plant Engineering for Izmit 60 MWe Combined Cycle Co-generation Plant Extension. 2009
SADELMI SPA Basic and Detailed Engineering for relocation of ABB GT, Heat Recovery Steam Boiler from Izmit to Tupras Aliaga for Entek Power Plant Relocation. 2007
ZORLU ENERGY, Russia Engineering Management Services for Combined Heat & Power Plants for Kozhukhovo, Tereshkova 2X 170 MWe Combined Heat & Power Plants. 2007
AKSA ENERGY Stress Analysis for DN300 Steam Piping for Samsun Power Plant. 2007
OZTAS CONSTRUCTION Engineering Services for Corum Natural Gas Compressor Station at Botas Corum Natural Gas Compressor Station. 2007
BOSEN Basic and Detailed Engineering of GE LM 6000 GT, HRSG, Steam Turbine, cooling system and Auxiliary Equipment for Bursa 63 MWe CCPP Extension. 2006
ERGAZ Detailed Engineering of 2X GE Frame 6B Gas Turbine Inlet Air Cooling Systems (chiller) for Enerjisa Adana Combined Cycle Power Plant. 2006
CERKEZKOY & NAR ENERGY Basic and Detailed Engineering of GE LM 6000 GT, Heat Recovery Steam Boiler (OTSG), Underground Steam Distribution Piping for Cerkezkoy 48 MWe Co-generation PP. 2006
GAMA POWER SYSTEMS Design, Engineering and I & C of Heat Recovery Steam Boilers for Entek Bursa & Iztek Izmit CCPPs, Erdemir Power Plant, Tupras Izmit Refinery. 2006
CALIK ENERGY, Turkmenistan Basic Engineering for proposal for Buzmein Combined Cycle Power Plant. 2005
Client / Project Project Scope Year
OMV, Austria Long Term Service agreement for the Plant Control and Instrumentation, Auxiliary Boilers, Heat Exchanging Equipment at Samsun Power Plant. 2013
AZERENERGY, Azerbaijan Erection Supervision, Complete Commissioning of the plant, and Start-up for Sirvan Power Plant. 2012
EKON PROKON, Turkey EUAS Ambarlı 810MWe Combined Cycle Power Plant Repowering Modernization of Steam Turbine and Generator Control and Protection System, including new I&C, new Mechanical Scope, Steam Turbine Hall Mechanical Rehabilitation Works, Implementation of Plant DCS System, Plant Field Instrumentation, Supply of LV Systems, and Installation & Commissioning of the Whole Electrical Balance of Plant. 2012
ATAER ENERGY Supply, Erection, Commissioning of Heat Recovery Steam Boiler (OTSG), air-cooled condenser, complete plant engineering, plant control system supply & implementation for Izmir 60 MWe Combined Cycle Power Plant Extension. 2010
ENTEK ENERGY Turn-key construction of GE LM 6000 Gas Turbine, Heat Recovery Steam Boiler (OTSG), and electrical/mechanical Balance of Plant including equipment foundations & complete civil works, complete plant engineering & control system extension for Izmit 60 MWe Combined Cycle Co-generation Plant Extension. 2009
OYAK EKON PROKON Engineering, procurement, erection, and commissioning of 2x Steam Boilers (75T/h each), 2x Siemens Steam Turbines (8.2 MWe each), and auxiliaries, including boiler control system for Kayseri Bogazliyan Sugar Factory. 2007
UNIT INTERNATIONAL Commissioning of instrumentation and Control System of 3x Siemens SGT 5-4000F GT Power Plant at Rudeshur 750 MWe Power Plant. 2005
AKENERJI Start-up & Commissioning of 3x 120 t/h Dual fuel steam boilers, 2 x HSRGs at Yalova Power Plant. 2004
AKENERJI Start-up & Commissioning of 3x 11 t/h HRSGs at Uşak Power Plant. 2003
AKENERJI Start-up & Commissioning of 2x 11 t/h HRSGs at Denizli Power Plant. 2002
Client / Project Project Scope Year
UGUR ENERGY Automation of CCPP including 1X Gas Turbine, 1X Heat Recovery Steam Boiler (OTSG), 1X Steam Turbine and BOP; Design, Implementation, Supply and Start-up for Cerkezkoy Combined Cycle Power Plant. 2011
ATAER ENERGY Automation of CCPP extension including 1X Gas Turbine, 1X Heat Recovery Steam Boiler (OTSG) and BOP; Design, Implementation, Supply and Start-up for Izmir Combined Cycle Power Plant Extension. 2011
AKENERJİ Wireless Data Communication Project for Uluabat Hydroelectricity Power Plant. 2011
TERMO HEAT Implementation, Start-up & Commissioning of Siemens S7-3XX Boiler Control System for Sivas-Kangal EUAS Power Plant. 2011
ISTAC Control System Re-programming, Implementation, Start-up, and Commissioning of 1X Fired Steam Boiler Burner Management System with Combustion Control and BOP for Odayeri Waste to Heat Plant. 2010
ENTEK ENERGY RF Data Communication System, Design, Supply and Commissioning for Bursa Power Plant. 2009
ENTEK ENERGY, Turkey I & C Engineering and Commissioning Supervision of CCPP extension including 1X Gas Turbine, 1X Heat Recovery Steam Boiler (OTSG), and BOP for Izmit Combined Cycle Co-generation Plant. 2009
ISKENDERUN IRON & STEEL FACTORY Instrumentation & Automation of Slab Casting O2 Gas Pressure Reducing System, Supply and Start-up for O2 Pressure Reducing Station. 2009
ADVANSA Control System Implementation and Start-up for CIPS Transfer System at Adana Power Plant. 2009
OZG ENERGY Fuel oil Storage and Distribution System Instrumentation Engineering and Supply for Hamitabat Power Plant. 2008
ADVANSA 2X HT Boiler Control System Design, Engineering including Burner Management System, and Start-up at Adana Power Plant. 2008
DOGA ENERGY Monitoring System for Liquid Fuel Pressures of the Gas Turbines at Bahcesehir Power Plant. 2008
ENERJISA Isochronous Mode Scenarios Between Generators, Load Sharing, Load Shedding Automation at Izmit Combined Cycle Power Plant. 2008
ISKENDERUN IRON & STEEL FACTORY Electrical, Automation, Instrumentation and Control Works for Water Network Control & Monitoring. 2008
KONYA SUGAR Electrical Systems & Automation of Pulp Drying Facility, Thin Juice Decalcification Unit and Lime Kiln at Cumra Sugar Factory. 2008
AKENERJI ABB Remote Terminal Unit (RTU) Data Exchange System at Aksa Akal Factory. 2008
SCA SELKASAN Automation of Steam Boiler, Heat Recovery Steam Boiler and BOP; Design, Engineering including Burner Management System, Implementation, Supply and Start-up for SCA Selkasan Manisa Power Plant. 2008
ISKENDERUN IRON & STEEL FACTORY Turn-key Design, Implementation, Supply and Start-up of 6X O2, Ar, H2 Pressure Reducing Stations, Control & Monitoring System, and additional operator stations for Slab Casting Plant O2 Pressure Reducing Station. 2007
SADELMI SPA Distributed Control System, Supply, Engineering, Commissioning & Start-up of Heat Recovery Steam Boiler for Aliaga Power Plant. 2007
TERMO HEAT Burner Management System for 2 X Double Fuel Burners, 4X Single Fuel Burners, Boiler Control System for 4X Boilers (Siemens S7-300) at Agri Sugar Factory. 2007
CERKEZKOY & NAR ENERGY Design, Supply, Engineering, Commissioning & Start-up of Distributed Control System for Cerkezkoy 48MWe Co-generation PP Plant. 2006
AKENERJI Supply, Engineering, Commissioning & Start-up of Distributed Control System for 9X Co-generation Power Plants. 2002 / 2006
ERDEMIR Modernization of Distributed Control System for Oxygen Plant #5. 2006
HABAS Distributed Control System, Supply, Engineering, Commissioning & Start-up for Aliaga 230MWe Combined Cycle Power Plant. 2006
OYAK EKON PROKON Complete Power Plant Distributed Control System, Supply, Engineering, Commissioning & Start-up for Kayseri Sugar Factory Power Plant. 2006
MILTEN Boiler Automation System. 2006
GAZ TEKNIK - SASA Burner Management System for 11X Double Fuel Burners, Individual Vaporizer for Control System & Redundant, Master Control System for 9X Vaporizers at Adana Polyesther Industrial Plant. 2005
SISECAM GROUP SODA INDUSTRY Distributed Control System, Supply, Engineering, Commissioning & Start-up for Burner Replacement of 3X Boilers. 2005
KAREGE Distributed Control System, Supply, Engineering, Commissioning & Start-up of 3X HRSG & Balance of Plant for Kemalpasa Power Plant. 2005
OZTAS Distributed Control System, Supply, Engineering, Commissioning & Start-up of HRSG, Balance of Plant & 34.5 kV Switchyard Systems for Etibor-Emet 10MWe Co-generation Power Plant NG Conversion. 2005
GAMA POWER SYSTEMS Design, Supply, Implementation of Boilers Control Systems and Boiler Management System for Adana Power Plant. 2005

Sparking Innovation, Energizing Your Vision

Whether you’re seeking expert advice on power generation, cutting-edge automation solutions, or comprehensive EPC services, our team is ready to assist. Share your project details with us, and let’s discuss how we can meet your expectations. We are committed to delivering excellence and driving innovation across the power, oil, and gas industries.

2024 © BGM Mühendislik Endüstriyel Uygulamalar Sanayi ve Ticaret A.Ş. All Rights Reserved.

  • Services
  • References
  • Contact